![]() ![]() ![]() Our favorite, Trail Ridge Road, has three must-see turnouts. Several roads in Rocky Mountain National Park serve up wide-open tundra. sight of open tundra, alpine vistas, and towering peaks. GET 60 OFF OUTSIDE+ The One Subscription to Fuel All Your Adventures. Due to the extended forecast for winter conditions at higher elevations, it is too soon to predict when that might be.įor further information about Rocky Mountain National Park please contact the park Information Office at (970) 586-1206, the Trail Ridge Road status recorded phone line at (970) 586-1222 or check the park’s website at. Here are 3 must-see Trail Ridge Road Overlooks. Park snowplow operators will continue to plow the road the road will open as soon as it is safe to do so. ![]() In a news release, the park said it’s too early to know when they’ll be able to get the road open this year because there are more cold temperatures in the forecast. The earliest the road has opened was on the latest June 26, 1943. Eleven miles of this “highway to the sky” is above tree line – with a high point of 12,183 feet. The road covers 48 miles between Estes Park and Grand Lake. Plow operators normally encounter drifts from 18 to 22 feet and are accustomed to plowing the same section of road over and over. Crews from the west side of the park and crews from the east side of the park move along the road and eventually meet near the Alpine Visitor Center. The extended forecast above 10,000 feet for snow, winds and overnight temperatures in the upper 20s will prevent us from opening the road this holiday.”Įvery year, Rocky Mountain National Park snowplow operators begin plowing Trail Ridge Road in mid-April. This week, our plow operators are facing 8 to 14 feet of snow on Trail Ridge Road. Last Wednesday, we were on track to open the road and were digging out facilities. Trail Ridge Road plowing operations started in April. The annual effort to open Trail Ridge Road across Rocky Mountain National Park to traffic is well underway. The famous high altitude road was on track to open on time as recently as last Wednesday, but because spring time in the Colorado high country is unpredictable, Rocky Mountain National Park’s plow operators now find themselves digging through eight to 14 feet of snow.Īccording to Park Superintendent, Darla Sidles, “Last week’s snowstorm has hampered our efforts. The following Fun Fact was originally published on May 19, 2003. Forecast Valid: 12am MDT Aug 1, 2023-6pm MDT. Point Forecast: Trail Ridge CO 40.43°N 105.75°W (Elev. Thanks to last week’s epic spring snowstorm and continuing winter conditions at high elevations in Rocky Mountain National Park, Trail Ridge Road’s opening will be delayed and will not open over the Memorial Day Holiday. Colorado Road Conditions Graphical Forecast Page Detailed Point Forecast Fire Weather Information Local Storm Report. Due to last week’s major snowstorm and continuing winter conditions at high elevations in Rocky Mountain National Park, Trail Ridge Road’s opening will be delayed and will not open over the Memorial Day Holiday. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |